University of
Illinois Townsend
Hall Renovation
University of
Illinois Townsend
Hall Renovation
Townsend Hall Renovation Enhances Student Living at University of Illinois
The project involves approximately 316,300 square feet in renovation and new construction that will increase dining capacity, improve building efficiency and sustainability, and showcase a vibrant residential experience to students, parents, and guests who visit campus. Booth Hansen architects, Boeren-Russo Builders, have partnered with University Housing to design the multimillion-dollar renovation.
ArmaGirt Z Girts Support Sustainability and Energy Efficiency
Along with sustainable design, the on-site supervision by Boeren Russo Builders of the continuous insulation system, using ArmaGirt Z Girt thermal breaks, assures low operating cost, sustainable, and comfortable living spaces.

Other Articles
& Projects
Armatherm Thermal Break Project Case Studies
The Cove: ArmaGirt Thermal Breaks Support Pursuit of LEED Points
Armatherm Thermal Break Project Case Studies
Thermal Break Solutions in Brick Shelf Angle Support Systems
Armatherm Thermal Break Project Case Studies
Thermal Breaking in Cladding and Modern Construction: Key to Energy Efficiency and Cost Savings
Armatherm Thermal Break Project Case Studies
Sustainable Living Innovations 303 Battery, Seattle WA
Armatherm Thermal Break Project Case Studies
Insulation Solution for ALDI’s £25M Facility
Armatherm Thermal Break Project Case Studies
University of Illinois- Townsend Hall
Armatherm Thermal Break Project Case Studies
Denver International Airport
Armatherm Thermal Break Project Case Studies
Armatherm thermal breaks supplied for the expansion project of Hampden Academy in Northern Maine-Case Study
Armatherm Thermal Break Project Case Studies
Armatherm Structural Thermal Breaks used to create sustainable, luxury apartments in New York
Armatherm Thermal Break Project Case Studies
Enhancing Energy Efficiency: Framingham State University’s Sustainable Ballroom Expansion with Armatherm
