grid
SCROLL

How Armatherm 500 Was Used in Aldi’s Distribution Centre

Armadillo was appointed by engineering firm, Craddy Pitchers Davidson to insulate the distribution centre’s 1000 sqm cold store room, used to stock thousands of frozen and chilled products before distribution to UK Aldi stores.

Why Thermal Breaks Were Needed Under Steel Column Bases

The manufacturer’s product, Armatherm™ 500, was installed directly under steel column bases which bridge the floor slab insulation. Support columns pass through the non-load bearing slab insulation to warm ground beneath, short circuiting the insulation barrier. Armatherm™ 500 is an inert, ultra-high density closed-cell polymer which offers high load capacity coupled with outstanding thermal performance.

Aldi Expands Use of Armatherm 500 Across More Projects

Since the installation, Aldi has appointed Armadillo to provide thermal breaks for three more distribution centres across the UK as a result.

Why Armatherm 500 Outperforms Timber in Thermal Breaks

Commenting on the project, Armadillo’s managing director, Jonathan Shaw said: “As this job called for a material with high-compressive strength and fantastic insulation properties, Armatherm™ 500 was the perfect solution for Aldi.

“Hardwoods such as Iroko timber are often specified for thermal breaks, but they absorb moisture and are prone to rot, making them ineffective. Due to its closed cell nature, our product will not absorb moisture and carries all the properties needed to bear column loads and isolate temperatures, which is exactly what the client needed. A material with all of these qualities is highly sought after in today’s market and many competitor products are over specified for these kind of applications so can not fulfil this demand economically.”

Where Else Armatherm 500 Is Being Used

Armatherm™ 500 has been used in a variety of construction projects, from structural steel framing connections and façades to residential builds and freezer rooms.

Aldi supermarket exterior with Armatherm thermal solutions

Other Articles
& Projects

Armatherm Projects

The Cove: ArmaGirt Thermal Breaks Support Pursuit of LEED Points

Courtyard of The Cove in Worcester, MA, with outdoor seating, artificial grass, and colourful light fixtures.
Armatherm Projects

Thermal Break Solutions in Brick Shelf Angle Support Systems

Person holding a thermal imaging camera aimed at a house, with heat loss areas displayed in red and yellow.
Armatherm Projects

Thermal Breaking in Cladding and Modern Construction: Key to Energy Efficiency and Cost Savings

High rise residential building of flats with cladding being replaced with fire resistant materials UK
Armatherm Projects

Sustainable Living Innovations – 303 Battery, Seattle WA

Armatherm Projects

Insulation Solution for ALDI’s £25M Facility

Aldi supermarket exterior with Armatherm thermal solutions
Armatherm Projects

University of Illinois- Townsend Hall

University of Illinois Townsend Hall project showcasing thermal bridging solutions
Armatherm Projects

Denver International Airport

Armatherm Projects

Armatherm thermal breaks supplied for the expansion project of Hampden Academy in Northern Maine-Case Study

Large structural assembly featuring Armatherm material at the Hampden Academy
Armatherm Projects

Armatherm Structural Thermal Breaks used to create sustainable, luxury apartments in New York

139 Fifth Avenue, Pelham, NY facade view
Armatherm Projects

Enhancing Energy Efficiency: Framingham State University’s Sustainable Ballroom Expansion with Armatherm

A worker cementing an area in a thermal break construction site.

Get in touch

Ready to talk about structural thermal breaks?

armatherm
Request a quote